81 St George Tce

81 St George Tce

Design, Fabrication and Install Steelwork and Cladding – Perth CBD

Completed in 6 weeks

Project Scope:

  • Removal of existing front entrance including concrete ramps and facade glazing while maintaining 24 access to building.
  • Design and draft structural and architectural steel for new facade and accessible lift enclosure.
  • Fabricate and install new steel structure for tenancy extension.
  • Fabricate and install new steel structure for Corten paneling for accessible lift enclosure.
  • Install Zinc standing seam cladding and flashings to new entrance.
  • Install raise Timber floor to tenancy extension.
  • Install new stainless steel handrails.