BDO Building

BDO Building

 

Works Completed

  • Class 1 Demolition
  • Access floor removal
  • Installation of Peri system crash deck to support the concrete ceiling for removal of concrete slabs
  • Cut concrete slab into sections using road saw and removed with block and tackle on a gantry
  • Preparing area for AKT Engineering to fabricate and install steel staircases

Waste Management

Waste separated at site level for safe and efficient safe removal

  • Recycled Waste included, rubble