Enex

Enex

STEEL LIFT SHAFT Z ALUMINIUM SLAT WALLS Z HANDRAILS PERTH CBD

Completed in 6 weeks

Project Scope:

  • Cutting and removal of concrete slab to form new lift shaft
  • Drafting and design of new 3 floor steel lift shaft to service the basement areas.
  • Fabrication and installation of new steel lift shaft.
  • Drafting of new feature aluminium slat walling to for new EOT enclosures.
  • Fabrication and Installation of new feature aluminium slat walls including doors with the basement area.
  • Drafting of multiple new handrail and balustrades throughout the public carpark area.
  • Fabrication and installation of handrails and balustrades.